INSTALLATION OF HIGH DISCAHRGE rate WELLS, DEWATERING, HYDROLOGICAL STUDIES, WELLS REHABILITATION AND WATER ASSESSMENT STUDIES

Installation of High discharge rate Wells for electrical power plants

  

Our company has possessed almost all kinds of soils control systems since 1990. Including high discharge rate production wells, dewatering, initiation of new irrigation pump stations. We have very big experience and expertise in the field of water research and water wells control systems. Some of our work in installation of different wells, dewatering and water research are listed below:


 

We work in the field of wells installations, for big projects like power plants. We have a big prequalification including the following services:

-Well designs & Engineering numerical analysis for aquifers and hydrological modeling

-Performing the necessary geophysical, geological and hydrogeological studies for installing new production wells, we produce the following services.

-Well logging

-Installing deep wells of high discharge rate using suitable circulating material (PAC R).

-Washing and maintenance of old installed wells for better performance.

-Determining the possibility of injecting water inside soil and studying the hazards.

-Studying well water quality and making complete analysis.

-Determining the sources of water contamination and percentage of pollutants such as oil and grease which could hurt turbines and pumps.

-Perform well pumping test. 

We Compile and analyze data for test wells, study surrounding geology and hydrology conditions to make production wells for critical projects such as power plants. Before installation of production wells, we study the groundwater quality, also perform chemical analysis for the pumped water to test the contents and its suitability for the project. The estimated parameters from the entire study enable the assessment of best locations of the future wells that will be required to cover the specific quantity and quantity of water needed for projects. 

We also produce numerical models by our experts (team of highest qualifications of Ph.D holders in best Universities in Egypt) to give expected performance of new installed wells, such as the change of the salinity or percentage of fines with time. These numerical models can also be applied to simulate the response of the aquifer to the different discharge rates during the lifetime of the well.   


The following are some selected projects of our work:


  

Project Name:Installing Test well and Water Analysis 

Place: New Abu Qir Thermal Power Plant

Client: West Delta Electricity Production Company

Target: Installing production wells of 200 m3/h & 3 Observation wells

Tools used: Drilling machines & chemical lab.

Date:  2025 


Project Name:Installing Test well and Water Analysis 

Place: New Abu Qir Thermal Power Plant

Client: West Delta Electricity Production Company

Target: Installing production one 100m depth wells of 100 m3/h 

Tools used: Drilling machines & chemical lab.

Date:  2025


Project Name:Installing Test well and Water Analysis 

Place: New Abu Qir Thermal Power Plant

Client: West Delta Electricity Production Company

Target: Installing production Two 70m depth wells of 100 m3/h 

Tools used: Drilling machines & chemical lab.

Date:  2025


Project Name:Installing Test well and Water Analysis 

Place: Sidi Kiris Power Plant

Client: West Delta Electricity Production Company

Target: Installing production Two 100m depth wells of 100 m3/h 

Tools used: Drilling machines & chemical lab.

Date:  2025


Project Name:Installing Test well and Water Analysis 

Place: South Helwan Power Plant_3X650 MW Unit

Client: Power Generation Engineering & Services Co.

Target: Installing production Two 100m depth wells of 200 m3/h 

Tools used: Drilling machines & chemical lab.

Date:  2024


Project Name:Installing of 300m deep well 

Place: Esna City

Client: Danish embassy.

Target: Installing of deep production well 300m of discharge rate 200 m3/h 

Tools used: Drilling machines & chemical lab.

Date:  2024

  

Project Name: Installation of more than 500 wells for farms and different companies in Egypt

Place: El-Saloum, Marsa Matrouh ,Elmenia,Hurghada,Marsa Alam,Ras sidr and Sharm El-Sheikh

Client: Different farms and companies in Egypt

Target: Water Production wells for 100-300 m depth

Tools used: Drilling machines & chemical lab.

Date:  2010-2023


  